Project Description
12th Avenue South Complete and Green Street
Submitted by the Middle Tennessee Section
Construction Cost | $7,400,000 | |
Project Location | Nashville, Tennessee | |
Project Owner | Nashville Department of Transportation (NDOT) | |
Project Designer | CDM Smith and LDA Engineering | |
Contractor | Roy T Goodwin | |
Completion Date | April 18, 2023 |
Project Description
The 12th Avenue South Complete and Green Streets Project is a 1.6-mile corridor consisting of new water line, protected bike lanes, 17 transit stop upgrades, green stormwater management infrastructure, and ADA compliant sidewalk & pedestrian safety improvements.
Project Features
- Green stormwater infrastructure including 50 urban bio-retention islands for stormwater quantity and quality treatment. Urban bio-retention islands capture runoff and treat the water by filtration through an engineered soil medium and infiltrated into an underdrain.
- improvements to 17 transit stops including dedicated boarding islands, bus stop shelters with wayfinding, and a paratransit accessible stop
- To increase bike safety and comfortability, the new bike lane is physically separated vertically and horizontally from vehicular traffic to provide protection to riders along 12th Avenue South.